King Salman City

CATEGORY

Project

BUDGET

200.000 SAR

DETAILS

CUSTOMER

King Salman City

LOCATION

Al Majma’ah

START DATA

21 December 19

DURATION

24 Months

PROJECT SIZE

346 ft

Project Description

FIRST ROSHN delivered a high-quality sports flooring project at King Salman City in Al Majma’ah. The project involved site preparation, concrete slab foundation, and installation of an advanced acrylic sports surface system designed for tennis and paddle courts. The facility was completed with durable fencing and proper drainage systems, ensuring safety and long-term performance under all weather conditions.

Project details

Project and Quotation

From Foundations to Finishes

Works NOT included

Lighting installation

Taxes and government fees

The project was completed efficiently with high standards of quality. The courts are now fully functional and ready to host local and regional sports events.

Cost Calculator

Court Size

Fencing Required?

No

Yes

Type of Surface:

  • Select Option

  • Artificial Turf

  • Acrylic System

  • PU System

  • EPDM Rubber

    • Select Option

    • Artificial Turf 50

    • Acrylic System 100

    • PU System 200

    • EPDM Rubber 300

$ 0

ESTIMATED PRICE

Building Steps

FIRST ROSHN follows a comprehensive, step-by-step approach to ensure every project is delivered with the highest quality and safety standards. Our experienced team manages each phase carefully, from initial site preparation to the final finishes.

1

Construction

We begin by preparing the site, securing safety measures, and mobilizing equipment. Excavations and groundwork are completed to create a stable base for the entire structure.

2

Renovation

Any existing structures or surfaces are carefully renovated or demolished as necessary to make way for new construction. This ensures a clean, secure environment for the new build.

START OF WORKS - Preparation and safety of the site

Clearing, leveling, and securing the site to guarantee a safe working environment.

FOUNDATIONS - excavations, construction of the floor and foundations

Creating a strong and level base to support the sports flooring system.

ENCLOSURE - Installation of fencing, glass panels, and boundary walls

Defining the playing area with durable materials for safety and compliance.

SURFACING - Application of acrylic or synthetic sports flooring system

Laying down the final playing surface tailored to the sport’s requirements.

FINISHES - Line marking, net installation, and final inspections

Completing all details to ensure the court is ready for play.

Sports Flooring Systems

PREV

Basketball Court

NEXT